Town of Lyons updates on projects

Town of Lyons updates on projects

Town of Lyons update on projects as of 6/25/22
==4th Avenue Pedestrian Bridge and sidewalk
==Lyons Thrive survey, update, deadline
==Corona Hill – request for re-assessment to Bo Co Parks & Open Space for a trail connecting to Hall Ranch Open Space trailhead
==Local Sales Tax Remittance up 11% this year
==Lyons Valley River Park Ponds update on water chemistry

Central Rocky Mt Permaculture Institute helps produce 150 plant natives of other temp zones

Central Rocky Mt Permaculture Institute helps produce 150 plant natives of other temp zones

A permaculture pioneer nurtures nature into a global food forest at 7,200 feet, producing a model of both survival and self-indulgence. Jerome Osentowski founded the Central Rocky Mountain Permaculture Institute (CRMPI) in 1986, and now has five greenhouses, built on a shoestring budget. Learn more…

Broadway/US36 Multimodal Improvement – graphic – give your comments

Broadway/US36 Multimodal Improvement – graphic – give your comments

Broadway/US36 Multimodal Improvement.
The project will include building a multimodal pathway, along the southern edge of Broadway, connecting CO-7/5th Ave in Lyons on the western end of downtown Lyons to the St Vrain trail network and Black Bear Hole at the eastern edge of town.
See the DESIGN and more.
Attend the first (virtual) meeting open to the public. 3/31/22

PCDC meeting on the proposed hotel on Main Street (summary)

PCDC meeting on the proposed hotel on Main Street (summary)

Notes taken at PCDC (Planning & Community Development Commission) Town of Lyons — to consider the presented development plans. Next step is the Board of Trustees; and getting the Permits.
== Addresses the Comprehensive Plan, Fiscal Impact and benefit to Town, why 79 rooms, parking needed, design criteria, local businesses’ comments, and more.

Report on the new hotel, planned to be built on Main Street

Report on the new hotel, planned to be built on Main Street

Proposed new hotel on Main Street, Lyons
Investigative Report
==names of parties involved
==review process
==historic importance
==sandstone
==hotel history (1903 year)
==structure integrity
==demolition and surrounding buildings
==cafe and patio
==need for hotel / 700 weddings
==parking spaces
==local comments